Current Road Works Pattaya (Threads Merged)


Bazle

Recommended Posts

As you can see, there are 3 big holes outside Big Mike which need filling, (although there are always big holes outside there which need filling but I don't think we can blame the construction  for that.) And after that it becomes varied in how far they have got to go. The next group are from Soi 7 to Soi 6.

20200212_115217.jpg

20200212_115426.jpg

20200212_115447.jpg

20200212_120019.jpg

Link to comment
Share on other sites

As you can see, they pipes are in the ground but the road, guttering and path a long way from finishing, in fact as one of the photo's show they are still digging up more road. The last photos show the digging up and crushing of the road up to Soi 3.

20200212_120229.jpg

20200212_120241.jpg

  • Like 4
  • Thumbs Up 2
Link to comment
Share on other sites

As an addendum to my walk.l recall back in October a news article about the electrical transformer boxes down near the pumping station needing to be moved before the construction could be completed. Well here we are 4 months on and not much seems to have been done.

20200212_125751.jpg

20200212_125913.jpg

20200212_125921.jpg

  • Sad 1
Link to comment
Share on other sites

Nowhere near to conclusion.  Long stretches of the road surface still to be completed, let alone work below the surface which must be completed before the road surface can be completed.  Also large quanitities of water which somehow will have to be drained away.

 

 

untitled-1105.jpg

untitled-1107.jpg

untitled-1111.jpg

untitled-1109.jpg

untitled-1112.jpg

untitled-1113.jpg

untitled-1114.jpg

untitled-1117.jpg

untitled-1118.jpg

untitled-1123.jpg

untitled-1122.jpg

untitled-1124.jpg

untitled-1129.jpg

untitled-1126.jpg

untitled-1127.jpg

untitled-1128.jpg

untitled-1130.jpg

untitled-1131.jpg

untitled-1138.jpg

untitled-1137.jpg

untitled-1134.jpg

untitled-1135.jpg

untitled-1139.jpg

untitled-1049.jpg

untitled-1050.jpg

  • Like 2
  • Thumbs Up 4
Link to comment
Share on other sites

2 hours ago, john luke said:

Nowhere near to conclusion.  Long stretches of the road surface still to be completed, let alone work below the surface which must be completed before the road surface can be completed.  Also large quanitities of water which somehow will have to be drained away.

You almost seem surprised. And yes, I am that asshole who asked which year 😉

Link to comment
Share on other sites

Update on the Beach Rd drainage project. Concrete drain forms in place and ready for use on the north end.
49551547022_753756651e_b.jpg

Breaking up the existing pavement is now up to Soi 2.
49550816568_cb620ac631_b.jpg

And digging commences at Soi 3.
49550817343_1e7c4f1c30_b.jpg

They've tied the trees to each other to keep the ones closest to the road from toppling over due to soil erosion.
49551315016_c3dacee75c_b.jpg

49550817278_1b27d084ff_b.jpg

This is odd. Where's the connecting drain south of Soi 6.
49551547647_6ee1828eea_b.jpg

Gutters and pavement being poured just north of Klang intersection.
49551546957_6287989656_b.jpg

49551314766_c85392e0e1_b.jpg

49550817078_a54fb4b17f_b.jpg

49550817018_dfc2828383_b.jpg

Turned my camera to sea and what do I see. Only two parasailers in the air this morning.
49551314846_11eca61bf5_b.jpg

South of Klang, drain covers going in.
49551547332_2eece899af_b.jpg

Around Soi 8, gutter work is pretty much done.
49550816953_bd96a788ce_b.jpg

With the exception of a few places where drain access points are being worked on.
49551314531_62a1957213_b.jpg

Boardwalk across from Mike's Mall is looking very rough and on its last legs.
49550816908_4948df69ed_b.jpg

South of Soi 12, only the curbs need to be installed.
49550816823_ff3fcef52a_b.jpg

New curbs installed up to Royal Garden Plaza. If it were me, I would have installed curbs at least twice as high to keep more of the storm water from flowing onto the footpath.
49551546942_9d4fca8bb8_b.jpg

At the south end, work still needs to be done to connect to the pumping station.
49550816833_e37254027c_b.jpg

Anyone need a used IV bag.
49551314356_14b0bee2a8_b.jpg

Quite the garbage pit on the south end.
49550816748_ccfecfd3fd_b.jpg

No way would I want to step on this access lid.
49551547012_9ccaa15efa_b.jpg

  • Like 1
  • Thanks 1
  • Great Info 1
  • Thumbs Up 2
Link to comment
Share on other sites

35 minutes ago, Painter said:

Thanks, @forcebwithu, that saves me posting the pictures of almost the same that I've just taken!

I am amazed at the speed they are digging and laying the pipes, but the finishing the gutters, and joining it all up seems to be taking forever! Then of course, they have to repair the pavements....

Sorry, didn't mean to scoop you. Can never have too many pics, so let's see what you've got.

Link to comment
Share on other sites

  • 2 weeks later...
1 hour ago, Painter said:

The surface drains still dont appear to be connected to the under road drain.

Work on the mega drain under the road has reached Markland.

It is about half full of water. Given the absence of rain, I'm assuming that that is caused by the water table, but would happily be corrected.

There is also a lot of building rubble and other crap in it.

Neither of these facts fills me with confidence that it will operate efficiently.

Link to comment
Share on other sites

42 minutes ago, Bazle said:

Work on the mega drain under the road has reached Markland.

It is about half full of water. Given the absence of rain, I'm assuming that that is caused by the water table, but would happily be corrected.

There is also a lot of building rubble and other crap in it.

Neither of these facts fills me with confidence that it will operate efficiently.

I'm sure once it is all connected up, a quick blast of the turbo pumps at the walking street end and all that rubbish will end up on koh larn's beaches.....

Or the pumps will jam up and need replacing...

 

  • Great Info 1
Link to comment
Share on other sites

From this mornings amble along the promenade...

Soi 7 ish... connecting up surface drains with underground drains...

20200301_133654.jpg

 

Opposite soi 10ish.  Her mate's down there passing up water...

20200301_134319.jpg

I can see two possible issues here....(1) are the two "walls" supposed to meet? (2) will they remove that red road barrier or just expect it to drain with the water?

20200301_133744.jpg

And, just for the sake of it, opposite central 

20200301_133920.jpg20200301_133931.jpg

20200301_133945.jpg

20200301_133954.jpg

20200301_133959.jpg

20200301_134054.jpg

  • Like 2
Link to comment
Share on other sites

They're now up to across from the Amari hotel breaking up the road surface for the Beach Rd drainage project.
49616788871_d54c3c8671_b.jpg

Soi 1 they've started digging.
49616788856_f7c4011a1f_b.jpg

They're setting up the Soi 6 pumps again, probably not for any expected rain, but to help drain the water that has been collecting in the drains under construction.
49616788826_b7c82f4eff_b.jpg

South end of Beach Rd. now getting backfilled.
49617045682_aa60191890_b.jpg

49616272473_df78e82452_b.jpg

A few more pics of the beach. South end has new shelters for the homeless.
49617045607_6d43815ea7_b.jpg

49616788676_d4f914ba2c_b.jpg

49616272358_a08020aac9_b.jpg

11:30 am and only one parasail up
49616788636_d62dfc6b0b_b.jpg

  • Like 3
  • Thanks 1
  • Thumbs Up 1
Link to comment
Share on other sites

This morning's walk took me from the Walking Street end of Beach Road to Pattaya Klang.

untitled-3754-2.jpg

There seems a lot to do in the immediate area of the pumping station.

untitled-3755-2.jpg

untitled-3756-2.jpg

untitled-3757-2.jpg

untitled-3758-2.jpg

untitled-3759-2-Edit.jpg

untitled-3760-2.jpg

untitled-3781.jpg

untitled-3761-2.jpg

untitled-3775.jpg

A few shots of the sand cleaner/sifter.

untitled-3776.jpg

untitled-3777.jpg

untitled-3778-Edit.jpg

untitled-3782.jpg

By way of comment, the road appears complete with the drainage and covers in place; however the pavement is in a very poor state, with loose blocks etc.  Additionally the level of the pavelement appears to be different to the level of the kerb at the road edge.  This more or less applies from here to Pattaya Klang.  Some work going on with the actual drainage system.

 

 

untitled-3783.jpg

untitled-3784.jpg

untitled-3785.jpg

untitled-3786.jpg

untitled-3787.jpg

untitled-3788.jpg

untitled-3789.jpg

untitled-3790.jpg

untitled-3791.jpg

untitled-3792.jpg

untitled-3793.jpg

untitled-3794.jpg

untitled-3795.jpg

untitled-3796.jpg

untitled-3797.jpg

untitled-3801.jpg

untitled-3800.jpg

untitled-3802.jpg

untitled-3803.jpg

untitled-3804.jpg

untitled-3805.jpg

untitled-3806.jpg

untitled-3807.jpg

untitled-3808.jpg

untitled-3811.jpg

untitled-3810.jpg

untitled-3812.jpg

untitled-3814.jpg

untitled-3815.jpg

  • Like 1
  • Thumbs Up 1
Link to comment
Share on other sites

I wonder when they started this if they took into account the damage it would do to the beach path. Perhaps it wasn't anticipated and therefore no plan has been put in place to repair it. No budget either. Maybe we will have to wait awhile for this to be done. I'm sure there are a few powerful people who will be happy to take this on at the right price, perhaps contract it out to a  relative.?

Link to comment
Share on other sites

×
×