There was a good hour plus of rain just after lunch today.  After this superficially the beach did not seem to have been affected very much at all.  Soi 6 northwards there are areas where rain water has run onto the beach and formed trenches as it proceeded towards the sea.  The road works themselves seem pretty much unchanged by the rain.  Water collecting in parts which have been dug up but no indication of flooding .

 

untitled-4572.jpg

untitled-4573.jpg

untitled-4574.jpg

untitled-4575.jpg

untitled-4576.jpg

untitled-4577.jpg

untitled-4578.jpg

untitled-4579.jpg

untitled-4580.jpg

untitled-4581.jpg

untitled-4582.jpg

untitled-4583.jpg

untitled-4584.jpg

untitled-4585.jpg

untitled-4586.jpg

untitled-4587.jpg

untitled-4588.jpg

untitled-4589.jpg

untitled-4590.jpg

untitled-4591.jpg

untitled-4592.jpg

untitled-4593.jpg

untitled-4594.jpg

untitled-4595.jpg

untitled-4597.jpg

untitled-4598.jpg

untitled-4599.jpg

untitled-4600.jpg

untitled-4601.jpg

untitled-4602.jpg

untitled-4603.jpg

untitled-4604.jpg

untitled-4605.jpg

untitled-4610.jpg

untitled-4607.jpg

untitled-4608.jpg

untitled-4609.jpg

untitled-4611.jpg

untitled-4612.jpg

  • Thanks 2
Link to comment
Share on other sites

Beach Rd photo update, starting from the north end.
49674670483_4c3cdc48f8_b.jpg

Never noticed any customers before today at the Thai Airways office. Line out the door keeping a proper social distance, probably looking to rebook canceled flights.
49675490712_4632c68d59_b.jpg

Looking north opposite Holiday Inn
49674670883_84cd1f0b52_b.jpg

Looking south from the same spot
49674670853_d0ccbc5f7a_b.jpg

Soi 1
49675491192_b8cca10360_b.jpg

Noticed this guy digging himself a cool spot in the sand.
49674670813_b7d683f278_b.jpg

49674670723_447f7f7aeb_b.jpg

49675205451_317525af0f_b.jpg

49674670653_28b62fceb1_b.jpg

Pavement work opposite The Bay
49675205376_0d62a5d1f9_b.jpg

49675205106_bc8b054461_b.jpg

Water north of Soi 6 is currently draining into a pit. Very odd they don't have a pipe yet that connects to the new drains south of this point.
49675491022_9051d996bc_b.jpg

Drain grates completed from just north of the Klang intersection.
49675205361_1a0bb60e41_b.jpg

Typical, quality Thai engineering on show.
49675205326_2f665402da_b.jpg

Curb construction almost to Mike's Mall.
49675490892_508f52460e_b.jpg

South end getting pumped out.
49675205231_b334e80e3b_b.jpg

49674670553_e8bed1b588_b.jpg

Beach is pretty empty.
49674670508_6c969a5ed1_b.jpg

And no parasails in the air.
49675490762_4595fe4d7a_b.jpg

  • Like 2
  • Thanks 1
  • Great Info 1
Link to comment
Share on other sites

Update of the north end of Beach Rd as of this morning. Looks like they might be fast tracking the project now that there's very few tourists left.

49699703366_044065cb76_b.jpg

Soi 1
49699172713_682c8ae227_b.jpg

Soi 2
49700014917_840d56a7fc_b.jpg

49699703271_10fa75db06_b.jpg

Soi 3
49699172618_658535c964_b.jpg

49700014827_cb83f17f51_b.jpg

Soi 5
49700014797_757789be85_b.jpg

And at Soi 6 it looks like they either dug out the buried pipe that connects the south end of the drains, or they installed the missing section in the past week. At any rate, the water from the north now has a way to continue on to the south.
49699172483_d7b2385736_b.jpg

  • Thanks 1
  • Thumbs Up 1
Link to comment
Share on other sites

  • 2 weeks later...
  • 2 weeks later...

TFP these and other updates FBWY, i always drive along Beach road when first arriving in Pattaya on every trip, i just love seeing the sea and these roadworks don't bother me one iota, it keeps the traffic speed down and gives me more time to view the goings on 😀 

  • Thanks 1
  • Thumbs Up 1
Link to comment
Share on other sites

1 hour ago, Blue Streak said:

024.JPG

Good pics. It's now over two months since the announced completion date of Feb 13, and because the construction is still not done and we're again heading into a period of more rain, they have to bring in the Big Green Pumper.

Link to comment
Share on other sites

2 hours ago, forcebwithu said:

Good pics. It's now over two months since the announced completion date of Feb 13, and because the construction is still not done and we're again heading into a period of more rain, they have to bring in the Big Green Pumper.

Given the lack of traffic and what I would imagine is a large pool of available labour, I wonder what excuse they'll come up with for the work not having been completed.

Link to comment
Share on other sites

7 minutes ago, Bazle said:

Given the lack of traffic and what I would imagine is a large pool of available labour, I wonder what excuse they'll come up with for the work not having been completed.

They had the plans upside down ???? :default_1087:

  • Haha 1
Link to comment
Share on other sites

3 hours ago, Bazle said:

Given the lack of traffic and what I would imagine is a large pool of available labour, I wonder what excuse they'll come up with for the work not having been completed.

As pointed out before, did they specify a year?

Link to comment
Share on other sites

It only seems like yesterday that they were widening the road and laying all the original coloured paving stones on the 'Promenade" and i was predicting monster traffic jams at the Walking Street end.

Happy days. 😀

Link to comment
Share on other sites

Won't be long now before the north end of Beach Rd is concreted over, and hopefully the last bits of drains connected.
49832003878_9887d20e7d_b.jpg

Hope someone notices the north end catch basin is almost full of sand before they close it up.
49832003833_90ac72f7ce_b.jpg

49832003758_bcdb28f210_b.jpg

49832847977_a308ef4e7d_b.jpg

Connecting the drains at the Soi 6 junction.
49832847952_c453a3587f_b.jpg

49832003653_079c02941b_b.jpg

49832539796_a080767660_b.jpg

49832539766_b78b22daee_b.jpg

49832003573_0e95919e89_b.jpg

This guy has found a nice cool spot to sleep the day away.
49832847797_78abc2e0a2_b.jpg

Southend is about finished too.
49832540281_36bff05277_b.jpg

49832004158_8988ef947e_b.jpg

49832004103_6e577be7c1_b.jpg

49832540141_9c9571c17f_b.jpg

  • Thanks 1
  • Thumbs Up 2
Link to comment
Share on other sites

Today's Beach Rd drainage project update.

49848332228_864317289e_b.jpg

49848865656_f1bc392777_b.jpg

49848865576_de69d3a3b6_b.jpg

Nice we can once again walk on the beach footpath without getting hassled by the BIB.
49848331868_47581108e0_b.jpg

49849172017_1a91a8c1ca_b.jpg

49848331703_df6af949e6_b.jpg

49848865286_6e9a72f049_b.jpg

New curbs are now north of Klang.
49848331533_3381607582_b.jpg

I hadn't noticed this before. The electric cable snake. Starts out above ground at a junction box.
49848866756_3319bc7535_b.jpg

Then dives underground for a short distance.
49848333198_1060fb4e43_b.jpg

49848333098_71892108ce_b.jpg

Then pops back up here.
49848333063_3d5e5315af_b.jpg

Then disappears into this mess.
49848332928_f0edebb31d_b.jpg

South end is almost ready the concrete truck.