Jump to content

Current Road Works Pattaya (Threads Merged)


Bazle

Recommended Posts

Beach Rd. repaving is done on the north end.
P9070004.jpg

The palm trees are now sporting big ass, super bright street lights. Better remember to bring sunglasses if you're going to walk the footpath at night.
P9070010.jpg

P9070010.jpg

There's also a whole slew of new combination street and footpath lights.
P9070015.jpg

The north end shower is still sitting uncompleted. Although it looks like they've hooked up the water main.
P9070018.jpg

New "5G signs" getting a test run.
P9070020.jpg

P9070022.jpg

Working on another shower farther south. I was tempted to remind them they having finished the one to the north yet.
P9070026.jpg

Working on more lights to turn night into day.
P9070031.jpg

Road resurfacing is now up to the Hilton.
P9070033.jpg

P9070034.jpg

Work on giving the manhole covers an six inch erections.
P9070039.jpg

2nd Road drainage junction with Soi 15.
P9070041.jpg

P9070043.jpg

Edited by forcebwithu
  • Like 5
  • Great Info 1
Link to comment
Share on other sites

On the walkway...

 

So there will be new floodlights on the tall floodlights...

New light from the new streetlights..

New floodlights on the Palm trees..

New light from the 5g sighs..


This massive light overkill should be the last nail in the coffin for Beach Road......

 

 

Edited by fforest
  • Surprised 2
Link to comment
Share on other sites

At 5.30pm today, Soi 15 was totally inaccessible from Second Road, even for pedestrians.

20230908_175902.jpg

I thought I'd be clever and enter via the small soi that runs parallel to Second Road (where the Hangover Lounge is), but it proved to be a dumb thought, not a clever one! 

20230908_173948.jpg

I had to walk all the way to The Avenue to get to Soi 15. 

  • Like 4
  • Great Info 1
  • Thumbs Up 2
Link to comment
Share on other sites

image.jpeg

This is the head of the construction work that's been putting wires underground.   They have been moving quickly down second road from the Central Festival Mall and have passed the Royal Garden mall on the way to, one assumes, Pattaya Tai.

But there's a problem if you turn 180 degrees.

 

image.jpeg

There's the soi 15 crew who have been taking forever to make the junction of the soi 15 pipe and the second road pipe.  They've had their side of the road blocked for ages.

 

If the construction crews meet second road will be shut off completely.

 

That may explain why the soi 15 crew were working long hours last night but as of this morning there's still a lot of them to do.

 

 

  • Like 1
  • Thanks 1
  • Thumbs Up 2
Link to comment
Share on other sites

City aims to complete Pattaya Beach Road by Sept.30

https://www.pattayamail.com/news/city-aims-to-complete-pattaya-beach-road-by-sept-30-440190

 

Pattaya-News-3-City-aims-to-complete-Pat

 

Pattaya, Thailand – In an effort to improve the iconic Pattaya Beach Road, a revised construction schedule has been carefully developed to expedite the asphalt paving project.

 

 

Iconic my azz......Has not been Iconic for a looong time....And gets less Iconic with every " improvement" Don't they notice the beach is mostly empty of people during daylight hours?..

 

 

Edited by fforest
  • Like 1
  • Great Info 1
Link to comment
Share on other sites

19 hours ago, thegrogmonster said:

Our government funding gets reduced for train delays that get blamed on maintenance issues. Our overhead linesmen carry frozen possums in their work trucks and these get thrown around for major faults.

We don't get penalised for force majeure events.

In my part of the world ravens get blamed for a lot of power outages, but we do fry the odd squirrel too....

  • Like 1
  • Thumbs Up 1
  • Haha 2
Link to comment
Share on other sites

22 minutes ago, johnpat said:

Two days ago this intersection of Soi 15 and Soi Buakhao had rebar down and was ready to be concreted....

But they've made negative progress here (although they did repair the break in the big pipe)

image.jpeg

Unbelievable how they take one step forward followed by two steps back.

My guess is the city contracted for a new road surface X meters wide, but the contractor thought they could get away with leaving in place the old concrete to save a few baht. Then the city inspector came by and caught what they were doing and told them to do it right.

@bob lt's picture below from Sunday showing the rebar in place with the old concrete on both sides of the road that hadn't been broken up and removed.

I'm also noticing how the concrete cover at the top end of Soi 15 doesn't leave them much depth for the new concrete road surface. Expect to see that area cracking and breaking apart within a short time of the new road opening to traffic.

IMG20230910150101.jpg

  • Like 4
  • Thumbs Up 2
Link to comment
Share on other sites

Yea baby Pattaya is now a 5G Smart city...It's funny how often conspiracy talk becomes conspiracy fact...

Smart Cities ......Where to start?  It's all bad so I won't start...

 

20230914_193200.jpg

 

20230914_193255.jpg

 

All this new industrial lighting really destroys the night atmosphere on the beach and the walkway.....As planned..

20230914_183756.jpg

20230914_184804.jpg

 

20230914_183921.jpg

20230914_184731.jpg

 

Night Photo

20230914_184022.jpg

 

Night photo

20230914_184515.jpg

 

20230914_185547.jpg

 

There will be loads of this horrible lighting in the Palm trees..

20230914_185328.jpg

 

 

20230914_185445.jpg

 

20230914_185410.jpg

 

 

20230914_192432.jpg

 

 

 

 

Edited by fforest
  • Like 3
  • Thanks 1
  • Sad 1
Link to comment
Share on other sites

×
×
  • Create New...